It's all about IAM

OIM 12c: Enhanced Schedule Jobs

There were two major drawbacks with the schedule jobs in older versions of OIM:

  • Monitoring the failed schedule jobs (Custom report or code was required)
  • Parameters which were passed during some schedule job execution

Oracle has provide solutions for both the problems listed above. Now we can see the parameters which were passed during the job execution and it also sends email notification to a particular user, distribution list or role.

No custom code or report is required to monitor failed jobs.

Just loving this feature.

OIM 12c Schedule Job


No comments:

Post a Comment